ITAC Assessment: CO0325
ITAC logo
ITAC Assessment: CO0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pharmaceuticals
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 192,600
ft2
Annual Production 600
lb
Production Hrs. Annual 8,064
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $800,945 15,147,128
kWh
Natural Gas $168,730 39,251
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,700 $73,280 $32,700
586,753
kWh
- -
02 2.8121: Apply for tax-free status for energy purchases $18,660 $250 - - $18,660
03 2.4133: Use most efficient type of electric motors $6,500 $7,990 $6,500
135,111
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,600 $140 $1,600
35,463
kWh
- -
05 2.1213: Direct warmest air to combustion intake $1,080 $570 - $1,080
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $1,970 $690
14,947
kWh
- -
TOTAL RECOMMENDED $61,230 $84,200 $41,490
772,274
kWh
$1,080
-
MMBtu
$18,660
TOTAL IMPLEMENTED $25,160 $8,240 $6,500
135,111
kWh
- $18,660
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs