| Assessment Year | 2000 |
|---|---|
| Principal Product | Processed Zinc and Aluminium |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
177,000
ft2
|
| Annual Production | 22,000,000
lb
|
| Production Hrs. Annual | 3,744
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $252,401 | 5,357,562 |
kWh
|
$0.047 |
| Electricity Demand | $279,863 | 18,780 |
kW-mo/yr
|
$14.90 |
| Electricity Fees | $29,280 | - |
|
- |
| Natural Gas | $291,937 | 102,798 |
MMBtu
|
$2.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $115,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $10,397 | $3,000 | n/a | - | - |
$10,397
-
MMBtu
|
- | - | - | - |
| 02 | 2.3137: Use power during off-peak periods | $9,788 | $1,000 | n/a |
$4,715
100,234
kWh
|
$8,804
-
kW-mo/yr
|
$(-3,231.0)
-
MMBtu
|
- | - | $(-500.0) | - |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,112 | - | n/a |
$1,631
34,584
kWh
|
$1,481
-
kW-mo/yr
|
- | - | - | - | - |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,057 | $800 | n/a |
$1,078
22,860
kWh
|
$979
-
kW-mo/yr
|
- | - | - | - | - |
| 05 | 2.7135: Install occupancy sensors | $945 | $1,350 | n/a |
$255
5,569
kWh
|
$690
-
kW-mo/yr
|
- | - | - | - | - |
| 06 | 2.1221: Replace obsolete burners with more efficient ones | $653 | $644 | n/a |
$653
67,409
kWh
|
- | - | - | - | - | - |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $428 | $1,350 | n/a |
$148
3,224
kWh
|
$291
-
kW-mo/yr
|
- | - | - | $(-11.0) | - |
| 08 | 3.7198: Reduce / eliminate use of disposable product | $22,175 | $25,000 | n/a | - | - | - | - |
$22,175
-
lb
|
- | - |
| 09 | 3.7198: Reduce / eliminate use of disposable product | $15,837 | $22,000 | n/a | - | - | - |
$15,837
-
gal
|
- | - | - |
| 10 | 4.821: Pay bills on time to avoid late fees | $49,668 | - | n/a | - | - | - | - | - | - | $49,668 |
| TOTAL RECOMMENDED | $115,060 | $55,144 |
$8,480
233,880
kWh
|
$12,245
-
kW-mo/yr
|
$7,166
-
MMBtu
|
$15,837
-
gal
|
$22,175
-
lb
|
$(-511.0) | $49,668 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs