ITAC Assessment: CO0323
ITAC logo
ITAC Assessment: CO0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cardiovascular Equipment
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 900
Plant Area 360,000
ft2
Annual Production 175,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $501,549 9,856,976
kWh
Natural Gas $44,331 11,651
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $110,140 $208,920 $110,140
1,492,087
kWh
-
02 2.7241: Install outside air damper / economizer on hvac unit $18,310 $55,500 $18,310
480,950
kWh
-
03 2.8114: Change rate schedules or other changes in utility service $16,090 $42,500 - $16,090
04 2.4133: Use most efficient type of electric motors $11,370 $8,790 $11,370
214,537
kWh
-
05 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $9,950 $34,080 $9,950
321,219
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,520 $4,210 $3,520
77,960
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,000 $7,800 $2,000
44,256
kWh
-
TOTAL RECOMMENDED $171,380 $361,800 $155,290
2,631,009
kWh
$16,090
TOTAL IMPLEMENTED $143,340 $277,420 $143,340
2,265,534
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs