ITAC Assessment: CO0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Fabricated Metal Products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 45,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,431
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,170 719,519
kWh
Natural Gas $30,623 12,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,070 $410 $2,070
30,481
kWh
-
02 2.4226: Use / purchase optimum sized compressor $1,600 $9,960 $1,600
23,447
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $670 $830 $670
9,672
kWh
-
04 2.8121: Apply for tax-free status for energy purchases $410 $250 - $410
05 2.4221: Install compressor air intakes in coolest locations $230 $100 $230
3,517
kWh
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $200 $100 $200
2,931
kWh
-
TOTAL RECOMMENDED $5,180 $11,650 $4,770
70,048
kWh
$410
TOTAL IMPLEMENTED $3,150 $1,490 $2,740
40,153
kWh
$410
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs