Assessment Year | 1994 |
---|---|
Principal Product | envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 87 |
Plant Area |
80,000
ft2
|
Annual Production | 670,000,000
pieces
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,800 | 3,311,841 |
kWh
|
$0.048 |
Natural Gas | $18,310 | 4,450 |
MMBtu
|
$4.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,040 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.5121: Recycle waste ink and cleanup solvent | $11,210 | $6,150 | - | - |
$11,210
-
gal
|
|
02 | 3.8142: Distill contaminated solvents for reuse | $6,370 | $7,200 |
$(-180.0)
(-3,810)
kWh
|
- |
$6,550
-
gal
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,310 | $5,820 |
$6,310
131,594
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,730 | $460 |
$5,730
119,578
kWh
|
- | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $4,320 | $6,800 |
$(-310.0)
(-6,448)
kWh
|
$4,630
-
MMBtu
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $2,000 | $460 |
$2,000
37,808
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $2,000 | $840 |
$2,000
41,618
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,100 | $210 |
$1,100
23,154
kWh
|
- | - | |
TOTAL RECOMMENDED | $39,040 | $27,940 |
$16,650
343,494
kWh
|
$4,630
-
MMBtu
|
$17,760
-
gal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs