ITAC Assessment: OK0621
ITAC logo
ITAC Assessment: OK0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Fiberglass & Vacuum Form Plastic
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 72,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,813 1,504,240
kWh
Electricity Fees $233 -
Natural Gas $19,976 3,438
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,536 $13,800 $3,200
56,638
kWh
- $336
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,000 $300 $8,100
142,945
kWh
- $(-100.0)
03 2.2437: Recover waste heat from equipment $2,550 $1,185 - $2,550
-
MMBtu
-
04 4.445: Install equipment to move product $50,500 $25,810 - - $50,500
05 4.424: Improve space comfort conditioning $47,308 $16,792 $(-160.0)
(-2,820)
kWh
- $47,468
TOTAL RECOMMENDED $111,894 $57,887 $11,140
196,763
kWh
$2,550
-
MMBtu
$98,204
TOTAL IMPLEMENTED $64,586 $41,095 $11,300
199,583
kWh
$2,550
-
MMBtu
$50,736
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs