ITAC Assessment: CO0316
ITAC logo
ITAC Assessment: CO0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product screw machine products
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 70,000
ft2
Annual Production 37,710,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,550 3,509,379
kWh
Natural Gas $26,100 5,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Gaseous Waste Savings
01 3.3131: Use evaporation to concentrate material $15,000 $15,000 - - $15,000
-
lb
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,740 $22,550 $7,740
143,318
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,280 $6,120 $7,280
134,818
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,850 $10,970 $5,850
108,148
kWh
- - -
05 3.8121: Cover containers to minimize evaporative losses $5,410 $300 - - - $5,410
-
lb
06 2.4133: Use most efficient type of electric motors $4,900 $7,530 $4,900
90,856
kWh
- - -
07 3.7112: Use squeegees, mops, and vacuums for floor cleaning $3,260 $700 - - $3,260
-
lb
-
08 2.2511: Insulate bare equipment $2,710 $1,850 $2,710
50,117
kWh
- - -
09 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $2,640 $13,000 - $2,640
-
gal
- -
10 2.4221: Install compressor air intakes in coolest locations $1,780 $450 $1,780
33,118
kWh
- - -
11 3.3127: Use adsorption, ion exchange to remove contaminants $620 $4,200 - $620
-
gal
- -
TOTAL RECOMMENDED $57,190 $82,670 $30,260
560,375
kWh
$3,260
-
gal
$18,260
-
lb
$5,410
-
lb
TOTAL IMPLEMENTED $23,560 $16,500 $14,890
275,791
kWh
- $3,260
-
lb
$5,410
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs