ITAC Assessment: CO0302
ITAC logo
ITAC Assessment: CO0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Refractory Products
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 57,700
ft2
Annual Production 2,700
ton
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,130 322,685
kWh
Natural Gas $87,880 21,861
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $8,280 $12,960 - $8,280
-
MMBtu
02 2.7231: Use radiant heater for spot heating $5,710 $12,960 - $5,710
-
MMBtu
03 2.2437: Recover waste heat from equipment $1,800 $5,450 - $1,800
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,950 $3,820 - $1,950
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $360 $60 $360
4,689
kWh
-
TOTAL RECOMMENDED $18,100 $35,250 $360
4,689
kWh
$17,740
-
MMBtu
TOTAL IMPLEMENTED $10,440 $18,470 $360
4,689
kWh
$10,080
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs