ITAC Assessment: CO0299
ITAC logo
ITAC Assessment: CO0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bronze Statues
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 25,000
ft2
Annual Production 234,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,470 495,018
kWh
Natural Gas $6,470 1,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,270 $450 $1,270
14,361
kWh
-
02 2.4133: Use most efficient type of electric motors $1,120 $1,870 $1,120
12,309
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,090 $1,660 $1,090
12,016
kWh
-
04 2.2437: Recover waste heat from equipment $880 $1,100 - $880
-
MMBtu
05 2.7135: Install occupancy sensors $790 $460 $790
8,792
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $690 $190 $690
7,620
kWh
-
07 2.2511: Insulate bare equipment $630 $180 $630
7,034
kWh
-
TOTAL RECOMMENDED $6,470 $5,910 $5,590
62,132
kWh
$880
-
MMBtu
TOTAL IMPLEMENTED $4,170 $4,170 $4,170
46,306
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs