Assessment Year | 1994 |
---|---|
Principal Product | Alfalfa and Calcuim based tablets |
NAICS |
n/a
|
SIC | 2833: Medicinal Chemicals and Botanical Products |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
52,000
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,130 | 737,691 |
kWh
|
$0.057 |
Natural Gas | $47,600 | 10,892 |
MMBtu
|
$4.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,540 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,190 | $4,420 |
$2,190
38,394
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,060 | $120 |
$2,060
36,049
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,900 | $1,900 |
$1,900
33,118
kWh
|
- | - | |
04 | 2.8121: Apply for tax-free status for energy purchases | $1,390 | $250 | - | - | $1,390 | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $970 | $2,060 |
$970
16,999
kWh
|
- | - | |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $580 | $1,240 | - |
$580
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $480 | $800 | - |
$480
-
MMBtu
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $440 | $200 |
$440
7,620
kWh
|
- | - | |
09 | 2.2136: Install / repair insulation on steam lines | $270 | $340 | - |
$270
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $10,280 | $11,330 |
$7,560
132,180
kWh
|
$1,330
-
MMBtu
|
$1,390 | ||
TOTAL IMPLEMENTED | $6,540 | $3,610 |
$4,400
76,787
kWh
|
$750
-
MMBtu
|
$1,390 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs