ITAC Assessment: CO0295
ITAC logo
ITAC Assessment: CO0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Custom keyboards and button switches
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 50,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,500 1,109,320
kWh
Natural Gas $15,610 4,034
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7131: Add area lighting switches $2,190 $500 $2,190
65,064
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,730 $10,620 $2,730
41,911
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,650 $4,520 $2,650
40,445
kWh
- -
04 2.2437: Recover waste heat from equipment $500 $670 - $500
-
MMBtu
-
05 2.1123: Install automatic stack damper $400 $500 - $400
-
MMBtu
-
06 2.8121: Apply for tax-free status for energy purchases $360 - - - $360
07 2.4221: Install compressor air intakes in coolest locations $140 $400 $140
2,345
kWh
- -
TOTAL RECOMMENDED $8,970 $17,210 $7,710
149,765
kWh
$900
-
MMBtu
$360
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs