ITAC Assessment: CO0293
ITAC logo
ITAC Assessment: CO0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Integrated circuits
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 46,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,510 2,600,528
kWh
Natural Gas $11,460 2,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,590 $14,640 $9,660
191,090
kWh
$(-4,070.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,220 $9,380 $3,220
63,599
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $1,500 $1,600 $510
10,844
kWh
$990
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,290 $1,810 $1,290
25,498
kWh
-
05 2.4133: Use most efficient type of electric motors $1,260 $1,360 $1,260
24,912
kWh
-
06 2.4226: Use / purchase optimum sized compressor $1,220 $1,800 $1,220
25,791
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $420 $550
10,844
kWh
-
TOTAL RECOMMENDED $14,630 $31,010 $17,710
352,578
kWh
$(-3,080.0)
-
MMBtu
TOTAL IMPLEMENTED $3,770 $9,800 $3,770
74,443
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs