ITAC Assessment: CO0290
ITAC logo
ITAC Assessment: CO0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Aluminum Beverage Containers
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 330,000
ft2
Annual Production 1,800,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,439,517 33,578,254
kWh
Natural Gas $508,859 176,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,960 $6,140 $13,960
325,615
kWh
-
02 2.4133: Use most efficient type of electric motors $12,920 $16,060 $12,920
301,583
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,750 $30,180 $10,750
250,879
kWh
-
04 2.2443: Re-use or recycle hot or cold process exhaust air $3,580 $5,000 - $3,580
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,350 $2,500 - $3,350
-
MMBtu
06 2.7261: Install timers and/or thermostats $900 $150 - $900
-
MMBtu
TOTAL RECOMMENDED $45,460 $60,030 $37,630
878,077
kWh
$7,830
-
MMBtu
TOTAL IMPLEMENTED $42,110 $57,530 $37,630
878,077
kWh
$4,480
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs