ITAC Assessment: CO0278
ITAC logo
ITAC Assessment: CO0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Refrigeration Equipment
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 275,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $416,356 8,711,899
kWh
Natural Gas $34,333 9,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.7314: Reduce ventilation air $6,130 $1,560 - $6,130
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,760 $710 $7,760
162,368
kWh
- -
03 2.7226: Use computer programs to optimize hvac performance $1,990 $100 $1,990
77,081
kWh
- -
04 2.7444: Close holes and openings in building such as broken windows $14,570 $2,700 - $14,570
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $530 $250 $530
11,137
kWh
- -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $7,120 $8,160 - - $7,120
07 2.4239: Eliminate or reduce compressed air usage $520 $750 $520
10,844
kWh
- -
08 2.4133: Use most efficient type of electric motors $4,350 $8,080 $4,350
90,856
kWh
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,040 $6,200 $4,450
93,200
kWh
$(-1,410.0)
-
MMBtu
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,520 $4,500 $1,520
31,946
kWh
- -
TOTAL RECOMMENDED $47,530 $33,010 $21,120
477,432
kWh
$19,290
-
MMBtu
$7,120
TOTAL IMPLEMENTED $36,630 $14,130 $8,810
184,349
kWh
$20,700
-
MMBtu
$7,120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs