Assessment Year | 1993 |
---|---|
Principal Product | Refrigeration Equipment |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
275,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 7,500
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $416,356 | 8,711,899 |
kWh
|
$0.048 |
Natural Gas | $34,333 | 9,671 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $6,130 | $1,560 | - |
$6,130
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,760 | $710 |
$7,760
162,368
kWh
|
- | - | |
03 | 2.7226: Use computer programs to optimize hvac performance | $1,990 | $100 |
$1,990
77,081
kWh
|
- | - | |
04 | 2.7444: Close holes and openings in building such as broken windows | $14,570 | $2,700 | - |
$14,570
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $530 | $250 |
$530
11,137
kWh
|
- | - | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $7,120 | $8,160 | - | - | $7,120 | |
07 | 2.4239: Eliminate or reduce compressed air usage | $520 | $750 |
$520
10,844
kWh
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $4,350 | $8,080 |
$4,350
90,856
kWh
|
- | - | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,040 | $6,200 |
$4,450
93,200
kWh
|
$(-1,410.0)
-
MMBtu
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,520 | $4,500 |
$1,520
31,946
kWh
|
- | - | |
TOTAL RECOMMENDED | $47,530 | $33,010 |
$21,120
477,432
kWh
|
$19,290
-
MMBtu
|
$7,120 | ||
TOTAL IMPLEMENTED | $36,630 | $14,130 |
$8,810
184,349
kWh
|
$20,700
-
MMBtu
|
$7,120 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs