ITAC Assessment: CO0266
ITAC logo
ITAC Assessment: CO0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cast Metal Products
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 14,000
ft2
Annual Production 1,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,914 1,661,196
kWh
Natural Gas $9,049 2,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $380 $130 $380
4,982
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $490 $300 $490
6,155
kWh
03 2.4226: Use / purchase optimum sized compressor $2,070 $5,000 $2,070
77,960
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $660 $690
8,792
kWh
05 2.4133: Use most efficient type of electric motors $2,730 $3,610 $2,730
34,877
kWh
TOTAL RECOMMENDED $6,360 $9,700 $6,360
132,766
kWh
TOTAL IMPLEMENTED $870 $430 $870
11,137
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs