ITAC Assessment: CO0265
ITAC logo
ITAC Assessment: CO0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Electronics
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area 43,000
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,073 847,304
kWh
Natural Gas $8,433 2,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,900 $250 $1,900
28,722
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,980 $1,730 $2,980
44,842
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,630 $600 $1,630
24,619
kWh
-
04 2.7314: Reduce ventilation air $1,070 $1,760 $170
2,638
kWh
$900
-
MMBtu
05 2.7261: Install timers and/or thermostats $700 $1,050 $130
4,982
kWh
$570
-
MMBtu
06 2.7135: Install occupancy sensors $450 $800 $360
5,569
kWh
$90
-
MMBtu
TOTAL RECOMMENDED $8,730 $6,190 $7,170
111,372
kWh
$1,560
-
MMBtu
TOTAL IMPLEMENTED $2,970 $2,010 $2,070
31,360
kWh
$900
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs