Assessment Year | 1992 |
---|---|
Principal Product | Fabricated Steel Products |
NAICS |
n/a
|
SIC | 3556: Food Products Machinery |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
130,200
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 5,876
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,591 | 2,067,702 |
kWh
|
$0.061 |
Natural Gas | $28,871 | 7,422 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 3.1121: Use more efficient adhesive applicators | $10,925 | $2,200 |
$10,925
92,614
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,850 | $160 |
$2,850
46,600
kWh
|
- | |
03 | 2.4224: Upgrade controls on compressors | $310 | $50 |
$310
4,982
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $690 | $160 |
$690
11,137
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $1,100 | $1,320 | - |
$1,100
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,020 | $1,190 |
$3,020
49,238
kWh
|
- | |
07 | 2.7132: Install timers on light switches in little used areas | $1,610 | $800 |
$1,610
26,377
kWh
|
- | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $12,940 | $14,000 |
$(-700.0)
(-11,430)
kWh
|
$13,640
-
MMBtu
|
|
09 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $560 | $1,100 | - |
$560
-
MMBtu
|
|
10 | 2.4133: Use most efficient type of electric motors | $4,170 | $10,320 |
$4,170
68,288
kWh
|
- | |
TOTAL RECOMMENDED | $38,175 | $31,300 |
$22,875
287,806
kWh
|
$15,300
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,250 | $29,100 |
$11,950
195,192
kWh
|
$15,300
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs