ITAC Assessment: CO0254
ITAC logo
ITAC Assessment: CO0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Fabricated Steel Products
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 130,200
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 5,876
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,591 2,067,702
kWh
Natural Gas $28,871 7,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 3.1121: Use more efficient adhesive applicators $10,925 $2,200 $10,925
92,614
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,850 $160 $2,850
46,600
kWh
-
03 2.4224: Upgrade controls on compressors $310 $50 $310
4,982
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $690 $160 $690
11,137
kWh
-
05 2.2437: Recover waste heat from equipment $1,100 $1,320 - $1,100
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,020 $1,190 $3,020
49,238
kWh
-
07 2.7132: Install timers on light switches in little used areas $1,610 $800 $1,610
26,377
kWh
-
08 2.7243: Improve air circulation with destratification fans / other methods $12,940 $14,000 $(-700.0)
(-11,430)
kWh
$13,640
-
MMBtu
09 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $560 $1,100 - $560
-
MMBtu
10 2.4133: Use most efficient type of electric motors $4,170 $10,320 $4,170
68,288
kWh
-
TOTAL RECOMMENDED $38,175 $31,300 $22,875
287,806
kWh
$15,300
-
MMBtu
TOTAL IMPLEMENTED $27,250 $29,100 $11,950
195,192
kWh
$15,300
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs