ITAC Assessment: CO0252
ITAC logo
ITAC Assessment: CO0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Computer Disk Drives
NAICS
n/a
SIC 3572: Computer Storage Devices
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 190,000
ft2
Annual Production 37,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,823 8,565,944
kWh
Natural Gas $20,369 4,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $580 $50 $20
1,172
kWh
$560
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $23,560 $9,330 $23,560
1,613,716
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,550 $4,910 $13,550
367,526
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,060 $410 $1,060
28,722
kWh
-
05 2.2437: Recover waste heat from equipment $1,975 $3,080 - $1,975
-
MMBtu
06 2.7224: Reduce space conditioning during non-working hours $4,300 $6,000 $4,300
277,843
kWh
-
07 2.4133: Use most efficient type of electric motors $2,050 $3,890 $2,050
55,686
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $450 $1,380 $450
12,016
kWh
-
TOTAL RECOMMENDED $47,525 $29,050 $44,990
2,356,681
kWh
$2,535
-
MMBtu
TOTAL IMPLEMENTED $47,525 $29,050 $44,990
2,356,681
kWh
$2,535
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs