| Assessment Year | 1992 |
|---|---|
| Principal Product | Computer Disk Drives |
| NAICS |
n/a
|
| SIC | 3572: Computer Storage Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 500 |
| Plant Area |
190,000
ft2
|
| Annual Production | 37,000
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $315,823 | 8,565,944 |
kWh
|
$0.037 |
| Natural Gas | $20,369 | 4,956 |
MMBtu
|
$4.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,525 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7314: Reduce ventilation air | $580 | $50 |
$20
1,172
kWh
|
$560
-
MMBtu
|
|
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $23,560 | $9,330 |
$23,560
1,613,716
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,550 | $4,910 |
$13,550
367,526
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,060 | $410 |
$1,060
28,722
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $1,975 | $3,080 | - |
$1,975
-
MMBtu
|
|
| 06 | 2.7224: Reduce space conditioning during non-working hours | $4,300 | $6,000 |
$4,300
277,843
kWh
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $2,050 | $3,890 |
$2,050
55,686
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $450 | $1,380 |
$450
12,016
kWh
|
- | |
| TOTAL RECOMMENDED | $47,525 | $29,050 |
$44,990
2,356,681
kWh
|
$2,535
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $47,525 | $29,050 |
$44,990
2,356,681
kWh
|
$2,535
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs