Assessment Year | 1992 |
---|---|
Principal Product | Injection Molded Medical Products |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
76,000
ft2
|
Annual Production | 16,000,000
pieces
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $385,686 | 9,903,283 |
kWh
|
$0.039 |
Natural Gas | $19,800 | 5,156 |
MMBtu
|
$3.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,450 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,210 | $350 |
$1,210
31,067
kWh
|
- | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $3,380 | $4,000 |
$(-190.0)
(-4,982)
kWh
|
$3,570
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,170 | $730 |
$3,170
81,477
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $18,750 | $37,860 |
$18,750
481,536
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,800 | $4,760 |
$1,800
46,307
kWh
|
- | |
06 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $5,460 | $17,470 |
$7,390
189,918
kWh
|
$(-1,930.0)
-
MMBtu
|
|
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $280 | $170 |
$280
7,327
kWh
|
- | |
08 | 2.6124: Establish equipment maintenance schedule | $400 | $40 |
$400
10,258
kWh
|
- | |
TOTAL RECOMMENDED | $34,450 | $65,380 |
$32,810
842,908
kWh
|
$1,640
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs