ITAC Assessment: CO0248
ITAC logo
ITAC Assessment: CO0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Injection Molded Medical Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 76,000
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,686 9,903,283
kWh
Natural Gas $19,800 5,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,210 $350 $1,210
31,067
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $3,380 $4,000 $(-190.0)
(-4,982)
kWh
$3,570
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,170 $730 $3,170
81,477
kWh
-
04 2.4133: Use most efficient type of electric motors $18,750 $37,860 $18,750
481,536
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,800 $4,760 $1,800
46,307
kWh
-
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $5,460 $17,470 $7,390
189,918
kWh
$(-1,930.0)
-
MMBtu
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $280 $170 $280
7,327
kWh
-
08 2.6124: Establish equipment maintenance schedule $400 $40 $400
10,258
kWh
-
TOTAL RECOMMENDED $34,450 $65,380 $32,810
842,908
kWh
$1,640
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs