| Assessment Year | 1992 |
|---|---|
| Principal Product | Fabricated Steel |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 71 |
| Plant Area |
74,000
ft2
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 6,448
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $40,060 | 617,819 |
kWh
|
$0.065 |
| Natural Gas | $30,417 | 8,133 |
MMBtu
|
$3.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,710 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,190 | $400 |
$1,190
18,464
kWh
|
- | |
| 02 | 2.7444: Close holes and openings in building such as broken windows | $240 | $150 | - |
$240
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,770 | $1,600 |
$1,770
27,257
kWh
|
- | |
| 04 | 2.7444: Close holes and openings in building such as broken windows | $2,090 | $1,720 | - |
$2,090
-
MMBtu
|
|
| 05 | 2.7224: Reduce space conditioning during non-working hours | $750 | $750 |
$50
1,758
kWh
|
$700
-
MMBtu
|
|
| 06 | 2.8121: Apply for tax-free status for energy purchases | $220 | $250 |
$166
-
kWh
|
$54
-
MMBtu
|
|
| 07 | 2.4133: Use most efficient type of electric motors | $1,680 | $4,010 |
$1,680
25,791
kWh
|
- | |
| 08 | 2.2612: Use cooling tower water instead of refrigeration | $770 | $3,100 |
$770
11,723
kWh
|
- | |
| 09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $660 | $1,800 |
$660
-
kWh
|
- | |
| TOTAL RECOMMENDED | $9,370 | $13,780 |
$6,286
84,993
kWh
|
$3,084
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,710 | $11,980 |
$5,626
84,993
kWh
|
$3,084
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs