ITAC Assessment: CO0245
ITAC logo
ITAC Assessment: CO0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Fabricated Steel
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 74,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,448
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,060 617,819
kWh
Natural Gas $30,417 8,133
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,190 $400 $1,190
18,464
kWh
-
02 2.7444: Close holes and openings in building such as broken windows $240 $150 - $240
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,770 $1,600 $1,770
27,257
kWh
-
04 2.7444: Close holes and openings in building such as broken windows $2,090 $1,720 - $2,090
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $750 $750 $50
1,758
kWh
$700
-
MMBtu
06 2.8121: Apply for tax-free status for energy purchases $220 $250 $166
-
kWh
$54
-
MMBtu
07 2.4133: Use most efficient type of electric motors $1,680 $4,010 $1,680
25,791
kWh
-
08 2.2612: Use cooling tower water instead of refrigeration $770 $3,100 $770
11,723
kWh
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $660 $1,800 $660
-
kWh
-
TOTAL RECOMMENDED $9,370 $13,780 $6,286
84,993
kWh
$3,084
-
MMBtu
TOTAL IMPLEMENTED $8,710 $11,980 $5,626
84,993
kWh
$3,084
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs