ITAC Assessment: CO0240
ITAC logo
ITAC Assessment: CO0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Beef
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 22,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,663 1,022,567
kWh
Natural Gas $14,247 2,638
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $970 $300 $870
13,482
kWh
$100
-
MMBtu
02 2.2511: Insulate bare equipment $330 $125 $160
1,758
kWh
$170
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $785 $250 $25
293
kWh
$760
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $470 $290 $470
6,741
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $290 $800 - $290
-
MMBtu
06 2.4133: Use most efficient type of electric motors $790 $3,090 $790
11,723
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $180 $30 $180
2,638
kWh
-
TOTAL RECOMMENDED $3,815 $4,885 $2,495
36,635
kWh
$1,320
-
MMBtu
TOTAL IMPLEMENTED $3,815 $4,885 $2,495
36,635
kWh
$1,320
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs