ITAC Assessment: OR0311
ITAC logo
ITAC Assessment: OR0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Frozen Vegetables
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 34,259,124
lb
Production Hrs. Annual 5,376
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,566 7,574,150
kWh
Electricity Demand $85,699 22,296
kW-mo/yr
Electricity Fees $8,830 -
Natural Gas $41,718 9,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.1191: Change procedures / equipment / operating conditions $112,722 $650,500 - - - - - - $112,722
02 2.2515: Use optimum thickness insulation $1,740 $4,421 $1,440
46,014
kWh
$300
-
kW-mo/yr
- - - - -
03 2.3212: Optimize plant power factor $8,062 $21,202 - - $8,062 - - - -
04 2.4133: Use most efficient type of electric motors $5,341 $20,064 $4,089
130,715
kWh
$1,252
-
kW-mo/yr
- - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $1,035 - $1,035
33,118
kWh
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,008 $1,514 $987
31,653
kWh
$170
-
kW-mo/yr
- - - $851 -
07 2.7124: Make a practice of turning off lights when not needed $273 - $208
6,741
kWh
$36
-
kW-mo/yr
- - - $29 -
08 2.1232: Keep boiler tubes clean $1,431 $1,500 - - - $1,431
-
MMBtu
- - -
09 3.4151: Minimize water usage $1,020 - - - - - $1,020
-
Tgal
- -
10 3.4151: Minimize water usage $275 - - - - - $275
-
Tgal
- -
TOTAL RECOMMENDED $133,907 $699,201 $7,759
248,241
kWh
$1,758
-
kW-mo/yr
$8,062 $1,431
-
MMBtu
$1,295
-
Tgal
$880 $112,722
TOTAL IMPLEMENTED $6,649 $20,064 $5,332
170,574
kWh
$1,288
-
kW-mo/yr
- - - $29 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs