ITAC Assessment: CO0234
ITAC logo
ITAC Assessment: CO0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $500
k
to 1
M
# of Employees 30
Plant Area 14,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,363 291,911
kWh
Natural Gas $9,798 2,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $810 $250 $654
-
kWh
$156
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $230 $1,000
11,723
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $505 $150 $340
13,189
kWh
$165
-
MMBtu
04 2.2691: Shut off cooling if cold outside air will cool process $85 $10,700 $85
1,172
kWh
-
05 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $390 $1,380 $390
14,947
kWh
-
06 2.2136: Install / repair insulation on steam lines $360 $1,480 $235
3,517
kWh
$125
-
MMBtu
TOTAL RECOMMENDED $3,150 $14,190 $2,704
44,548
kWh
$446
-
MMBtu
TOTAL IMPLEMENTED $3,150 $14,190 $2,704
44,548
kWh
$446
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs