Assessment Year | 1991 |
---|---|
Principal Product | RECYCLED PAPERBOARD |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 310,000
ton
|
Production Hrs. Annual | 7,100
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $832,105 | 15,509,965 |
kWh
|
$0.054 |
Natural Gas | $650,014 | 244,492 |
MMBtu
|
$2.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,848 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $5,430 | $250 |
$5,430
-
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,430 | $50 |
$1,430
28,722
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,945 | $500 |
$2,945
54,807
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,322 | $1,300 |
$2,322
43,376
kWh
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $3,455 | $500 | - |
$3,455
-
MMBtu
|
|
06 | 2.2223: Enhance sensitivity of temperature control and cutoff | $4,542 | $1,000 | - |
$4,542
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $2,934 | $2,648 | - |
$2,934
-
MMBtu
|
|
08 | 2.4133: Use most efficient type of electric motors | $5,746 | $10,692 |
$5,746
106,975
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15,044 | $31,984 |
$15,044
280,481
kWh
|
- | |
TOTAL RECOMMENDED | $43,848 | $48,924 |
$32,917
514,361
kWh
|
$10,931
-
MMBtu
|
||
TOTAL IMPLEMENTED | $43,848 | $48,924 |
$32,917
514,361
kWh
|
$10,931
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs