ITAC Assessment: CO0216
ITAC logo
ITAC Assessment: CO0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SEMI CONDUCTORS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 101,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,851 2,436,694
kWh
Natural Gas $5,672 1,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $1,400 $500 $300
10,551
kWh
$1,100
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,084 $2,170 $2,084
46,600
kWh
-
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,100 $800 $700
27,257
kWh
$400
-
MMBtu
04 2.4322: Use or replace with energy efficient substitutes $303 $598 $303
6,741
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $280 $150 $280
6,448
kWh
-
06 2.8121: Apply for tax-free status for energy purchases $240 $250 - $240
-
MMBtu
07 2.7122: Disconnect ballasts $440 $800 $440
9,965
kWh
-
08 2.1123: Install automatic stack damper $440 $1,100 - $440
-
MMBtu
TOTAL RECOMMENDED $6,287 $6,368 $4,107
107,562
kWh
$2,180
-
MMBtu
TOTAL IMPLEMENTED $6,287 $6,368 $4,107
107,562
kWh
$2,180
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs