| Assessment Year | 1991 |
|---|---|
| Principal Product | WELDING EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3548: Electric and Gas Welding and Soldering Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,484 | 531,360 |
kWh
|
$0.063 |
| Natural Gas | $19,986 | 5,552 |
MMBtu
|
$3.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,558 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,558 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,100 | $200 |
$2,100
75,029
kWh
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $4,300 | $2,300 |
$4,300
68,581
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $4,840 | $4,200 | - |
$4,840
-
MMBtu
|
|
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,061 | $10,000 |
$(-414.0)
(-6,448)
kWh
|
$3,475
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $337 | $559 |
$337
5,275
kWh
|
- | |
| 06 | 2.6223: Schedule use of elevators to conserve energy | $920 | $300 |
$460
4,103
kWh
|
$460
-
MMBtu
|
|
| TOTAL RECOMMENDED | $15,558 | $17,559 |
$6,783
146,540
kWh
|
$8,775
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,558 | $17,559 |
$6,783
146,540
kWh
|
$8,775
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs