ITAC Assessment: CO0212
ITAC logo
ITAC Assessment: CO0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WELDING EQUIPMENT
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,484 531,360
kWh
Natural Gas $19,986 5,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,100 $200 $2,100
75,029
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $4,300 $2,300 $4,300
68,581
kWh
-
03 2.7261: Install timers and/or thermostats $4,840 $4,200 - $4,840
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $3,061 $10,000 $(-414.0)
(-6,448)
kWh
$3,475
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $337 $559 $337
5,275
kWh
-
06 2.6223: Schedule use of elevators to conserve energy $920 $300 $460
4,103
kWh
$460
-
MMBtu
TOTAL RECOMMENDED $15,558 $17,559 $6,783
146,540
kWh
$8,775
-
MMBtu
TOTAL IMPLEMENTED $15,558 $17,559 $6,783
146,540
kWh
$8,775
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs