ITAC Assessment: CO0195
ITAC logo
ITAC Assessment: CO0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SKI LIFT SYSTEMS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 15
pieces
Production Hrs. Annual 0
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,054 507,034
kWh
Natural Gas $6,035 1,175
MMBtu
Other Energy $6,724 98
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,982

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings
01 2.1332: Convert combustion equipment to burn natural gas $6,200 $5,400 - $(-500.0)
-
MMBtu
$6,700
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $850 $100 $850
11,723
kWh
- -
03 2.4133: Use most efficient type of electric motors $218 $433 $218
2,931
kWh
- -
04 2.7243: Improve air circulation with destratification fans / other methods $1,500 $2,000 $(-30.0)
(-293)
kWh
$1,530
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,330 $900 $1,330
18,171
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $317 $237 $317
4,396
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $620 $1,460 $620
8,499
kWh
- -
08 2.8121: Apply for tax-free status for energy purchases $407 $250 $89
-
kWh
$318
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $360 $600 $120
5,569
kWh
$240
-
MMBtu
-
TOTAL RECOMMENDED $11,802 $11,380 $3,514
50,996
kWh
$1,588
-
MMBtu
$6,700
-
MMBtu
TOTAL IMPLEMENTED $4,982 $4,520 $2,894
42,497
kWh
$2,088
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs