ITAC Assessment: CO0193
ITAC logo
ITAC Assessment: CO0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product POTATO AND CORN CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 7,280
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,551 3,681,712
kWh
Natural Gas $304,572 114,977
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,700 $18,000 - $8,700
-
MMBtu
02 2.4133: Use most efficient type of electric motors $946 $1,055 $946
19,343
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $3,500 $1,000 $3,500
72,392
kWh
-
04 2.2437: Recover waste heat from equipment $2,700 $7,000 - $2,700
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,900 $500 $1,900
38,101
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $3,000 $6,000 $3,000
120,750
kWh
-
TOTAL RECOMMENDED $20,746 $33,555 $9,346
250,586
kWh
$11,400
-
MMBtu
TOTAL IMPLEMENTED $6,500 $7,000 $6,500
193,142
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs