ITAC Assessment: CO0190
ITAC logo
ITAC Assessment: CO0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PRIME MOVER CONTROLS
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $50
M
to 100
M
# of Employees 1,100
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $733,084 17,365,475
kWh
Natural Gas $110,777 28,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $18,396 $4,200 - $18,396
-
MMBtu
02 2.7261: Install timers and/or thermostats $12,172 $3,000 $12,172
288,394
kWh
-
03 2.7262: Separate controls of air handlers from ac/ heating systems $12,764 $20,000 $5,783
383,353
kWh
$6,981
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $10,341 $8,200 $10,341
245,018
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,432 $10,800 $3,405
225,674
kWh
$5,027
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,041 $3,783 $1,041
24,619
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,555 $2,000 - $1,555
-
MMBtu
08 2.4133: Use most efficient type of electric motors $1,871 $1,998 $1,871
44,256
kWh
-
09 2.1212: Operate boilers on high fire setting $2,147 $6,000 - $2,147
-
MMBtu
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,910 $3,708 $1,910
45,428
kWh
-
11 2.4221: Install compressor air intakes in coolest locations $1,544 $300 $1,544
36,635
kWh
-
12 2.2511: Insulate bare equipment $492 $103 $492
11,723
kWh
-
TOTAL RECOMMENDED $72,665 $64,092 $38,559
1,305,100
kWh
$34,106
-
MMBtu
TOTAL IMPLEMENTED $41,781 $45,692 $28,218
1,060,082
kWh
$13,563
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs