ITAC Assessment: CO0189
ITAC logo
ITAC Assessment: CO0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COATED STEEL PIPES
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 6,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,417 1,383,939
kWh
Natural Gas $15,785 4,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,200 $13,000 $3,200
41,032
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,716 $15,000 $2,716
34,584
kWh
03 2.4133: Use most efficient type of electric motors $800 $1,720 $800
10,258
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,170 $200 $1,170
14,947
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,100 $3,200 $1,100
13,775
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $800 $500 $800
9,965
kWh
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $230 $300 $230
9,379
kWh
TOTAL RECOMMENDED $10,016 $33,920 $10,016
133,940
kWh
TOTAL IMPLEMENTED $6,816 $20,920 $6,816
92,908
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs