| Assessment Year | 1990 |
|---|---|
| Principal Product | COATED STEEL PIPES |
| NAICS |
n/a
|
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
n/a
|
| Annual Production | 6,000
thousand feet
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $108,417 | 1,383,939 |
kWh
|
$0.078 |
| Natural Gas | $15,785 | 4,580 |
MMBtu
|
$3.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,016 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,816 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,200 | $13,000 |
$3,200
41,032
kWh
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,716 | $15,000 |
$2,716
34,584
kWh
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $800 | $1,720 |
$800
10,258
kWh
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,170 | $200 |
$1,170
14,947
kWh
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,100 | $3,200 |
$1,100
13,775
kWh
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $800 | $500 |
$800
9,965
kWh
|
|
| 07 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $230 | $300 |
$230
9,379
kWh
|
|
| TOTAL RECOMMENDED | $10,016 | $33,920 |
$10,016
133,940
kWh
|
||
| TOTAL IMPLEMENTED | $6,816 | $20,920 |
$6,816
92,908
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||