ITAC Assessment: CO0179
ITAC logo
ITAC Assessment: CO0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FLUID MILK & SOFT DRINKS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area
n/a
Annual Production 9,400
Tgal
Production Hrs. Annual 4,004
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,947 2,064,478
kWh
Natural Gas $68,392 12,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,400 $1,500 - $4,400
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $1,400 $500 $1,400
21,688
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $358 $339 $358
5,569
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $120 $700 $120
1,758
kWh
- -
05 3.4154: Eliminate leaks in water lines and valves $2,480 $350 - $1,987
-
MMBtu
$493
TOTAL RECOMMENDED $8,758 $3,389 $1,878
29,015
kWh
$6,387
-
MMBtu
$493
TOTAL IMPLEMENTED $8,758 $3,389 $1,878
29,015
kWh
$6,387
-
MMBtu
$493
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs