Assessment Year | 2009 |
---|---|
Principal Product | Windows & Doors |
NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 2,167
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $368,489 | 2,267,100 |
kWh
|
$0.16 |
Electricity Demand | $157,286 | 18,759 |
kW-mo/yr
|
$8.38 |
Electricity Fees | $5,400 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,344 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,420 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,487 | $31,140 |
$32,294
198,123
kWh
|
$9,193
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,203 | $31,350 |
$23,390
143,901
kWh
|
$6,813
-
kW-mo/yr
|
|
03 | 2.6218: Turn off equipment when not in use | $23,952 | $3,320 |
$18,424
113,355
kWh
|
$5,528
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,351 | $1,210 |
$4,943
30,325
kWh
|
$1,408
-
kW-mo/yr
|
|
05 | 2.4323: Use optimum size and capacity equipment | $4,234 | $4,531 |
$3,295
20,217
kWh
|
$939
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,117 | $40 |
$1,648
10,108
kWh
|
$469
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $108,344 | $71,591 |
$83,994
516,029
kWh
|
$24,350
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $32,420 | $4,570 |
$25,015
153,788
kWh
|
$7,405
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs