ITAC Assessment: MI0179
ITAC logo
ITAC Assessment: MI0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Windows & Doors
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,167
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,489 2,267,100
kWh
Electricity Demand $157,286 18,759
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,487 $31,140 $32,294
198,123
kWh
$9,193
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $30,203 $31,350 $23,390
143,901
kWh
$6,813
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $23,952 $3,320 $18,424
113,355
kWh
$5,528
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,351 $1,210 $4,943
30,325
kWh
$1,408
-
kW-mo/yr
05 2.4323: Use optimum size and capacity equipment $4,234 $4,531 $3,295
20,217
kWh
$939
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,117 $40 $1,648
10,108
kWh
$469
-
kW-mo/yr
TOTAL RECOMMENDED $108,344 $71,591 $83,994
516,029
kWh
$24,350
-
kW-mo/yr
TOTAL IMPLEMENTED $32,420 $4,570 $25,015
153,788
kWh
$7,405
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs