| Assessment Year | 1990 |
|---|---|
| Principal Product | CALCUIM SILICATE INSULATION |
| NAICS |
n/a
|
| SIC | 3297: Nonclay Refractories |
| Sales Range | $5 M to 10M |
| # of Employees | 87 |
| Plant Area |
n/a
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $271,045 | 7,063,306 |
kWh
|
$0.038 |
| Natural Gas | $449,590 | 156,079 |
MMBtu
|
$2.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,678 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,964 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $11,860 | $15,260 | - |
$11,860
-
MMBtu
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,110 | $12,000 |
$12,110
315,651
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,950 | $600 |
$1,950
50,703
kWh
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $854 | $285 |
$271
11,723
kWh
|
$583
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $394 | $480 |
$394
10,258
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $510 | $1,500 |
$510
13,482
kWh
|
- | |
| TOTAL RECOMMENDED | $27,678 | $30,125 |
$15,235
401,817
kWh
|
$12,443
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,964 | $14,580 |
$14,964
390,094
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs