ITAC Assessment: CO0177
ITAC logo
ITAC Assessment: CO0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CALCUIM SILICATE INSULATION
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $5
M
to 10
M
# of Employees 87
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,045 7,063,306
kWh
Natural Gas $449,590 156,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,860 $15,260 - $11,860
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,110 $12,000 $12,110
315,651
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,950 $600 $1,950
50,703
kWh
-
04 2.7261: Install timers and/or thermostats $854 $285 $271
11,723
kWh
$583
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $394 $480 $394
10,258
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $1,500 $510
13,482
kWh
-
TOTAL RECOMMENDED $27,678 $30,125 $15,235
401,817
kWh
$12,443
-
MMBtu
TOTAL IMPLEMENTED $14,964 $14,580 $14,964
390,094
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs