ITAC Assessment: CO0173
ITAC logo
ITAC Assessment: CO0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PRINTED CIRCUIT BOARDS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 47
Plant Area
n/a
Annual Production 175,000
pieces
Production Hrs. Annual 4,628
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,993 495,897
kWh
Natural Gas $2,969 744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,300 $500 $3,300
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,010 $220 $1,010
13,189
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $70 $190 $70
879
kWh
-
04 2.7261: Install timers and/or thermostats $910 $800 $540
20,809
kWh
$370
-
MMBtu
05 2.2511: Insulate bare equipment $460 $200 $460
6,155
kWh
-
06 2.2514: Cover open tanks $210 $400 $210
2,931
kWh
-
TOTAL RECOMMENDED $5,960 $2,310 $5,590
43,963
kWh
$370
-
MMBtu
TOTAL IMPLEMENTED $2,660 $1,810 $2,290
43,963
kWh
$370
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs