ITAC Assessment: CO0151
ITAC logo
ITAC Assessment: CO0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ALIMINUM CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area
n/a
Annual Production 1,001,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,126,404 24,810,962
kWh
Natural Gas $339,532 157,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,920 $3,800 - $1,920
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $470 $200 - $470
-
MMBtu
03 2.6232: Install set-back timers $6,060 $200 $6,060
133,646
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $643 $382 $643
14,068
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $146 $300 $146
3,224
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $18,580 $24,150 $18,580
409,437
kWh
-
07 2.7226: Use computer programs to optimize hvac performance $620 $1,000 $620
25,205
kWh
-
08 2.8121: Apply for tax-free status for energy purchases $31,700 $250 $31,700
-
kWh
-
09 2.2511: Insulate bare equipment $510 $1,150 - $510
-
MMBtu
TOTAL RECOMMENDED $60,649 $31,432 $57,749
585,580
kWh
$2,900
-
MMBtu
TOTAL IMPLEMENTED $57,599 $25,482 $57,129
560,375
kWh
$470
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs