ITAC Assessment: CO0150
ITAC logo
ITAC Assessment: CO0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CONCRETE PIPE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 60,000
ton
Production Hrs. Annual 2,652
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,815 1,315,064
kWh
Natural Gas $82,849 22,843
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6124: Establish equipment maintenance schedule $2,680 $900 $2,680
32,825
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,420 $500 $1,420
17,292
kWh
-
03 2.2437: Recover waste heat from equipment $250 $300 - $250
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $800 $200 $800
9,672
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $760 $1,400 $760
9,379
kWh
-
06 2.7261: Install timers and/or thermostats $429 $600 $17
586
kWh
$412
-
MMBtu
07 2.8113: Purchase gas directly from a contract gas supplier $11,600 $6,700 - $11,600
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $463 $387 $463
5,569
kWh
-
09 2.8121: Apply for tax-free status for energy purchases $1,370 $250 $1,370
-
kWh
-
TOTAL RECOMMENDED $19,772 $11,237 $7,510
75,323
kWh
$12,262
-
MMBtu
TOTAL IMPLEMENTED $19,772 $11,237 $7,510
75,323
kWh
$12,262
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs