ITAC Assessment: CO0147
ITAC logo
ITAC Assessment: CO0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 71,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,693 4,516,120
kWh
Natural Gas $34,825 8,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $440 $200 $440
10,258
kWh
-
02 2.2437: Recover waste heat from equipment $1,000 $400 - $1,000
-
MMBtu
03 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $932 $37 $114
2,638
kWh
$818
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,785 $3,400 $2,785
64,478
kWh
-
05 2.3132: Recharge batteries on during off-peak demand periods $490 $200 $490
-
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,986 $1,862 $1,986
46,014
kWh
-
07 2.8121: Apply for tax-free status for energy purchases $1,720 $250 - $1,720
-
MMBtu
TOTAL RECOMMENDED $9,353 $6,349 $5,815
123,388
kWh
$3,538
-
MMBtu
TOTAL IMPLEMENTED $7,863 $5,749 $5,325
123,388
kWh
$2,538
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs