Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ANIMAL FEED
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 70,000
ton
Production Hrs. Annual 4,936
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,918 2,823,857
kWh
Natural Gas $49,916 15,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,650 $500 - $4,650
-
MMBtu
-
02 2.2441: Preheat boiler makeup water with waste process heat $2,253 $13,500 - $2,253
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,856 $1,500 $8,251
176,729
kWh
$(-2,395.0)
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $963 - $1,463
-
kWh
- $(-500.0)
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,949 $5,481 $2,949
63,013
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $4,942 $3,500 $4,942
105,510
kWh
- -
07 2.2122: Install / repair insulation on condensate lines $678 $200 - $678
-
MMBtu
-
08 2.7261: Install timers and/or thermostats $500 $450 $143
5,862
kWh
$357
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $214 $267 $214
4,689
kWh
- -
TOTAL RECOMMENDED $23,005 $25,398 $17,962
355,803
kWh
$5,543
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $17,803 $6,417 $15,013
292,790
kWh
$3,290
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs