| Assessment Year | 1989 |
|---|---|
| Principal Product | GRANULATED SUGAR |
| NAICS |
n/a
|
| SIC | 2063: Beet Sugar |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 500,000
ton
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Wyoming |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $323,285 | 10,536,636 |
kWh
|
$0.031 |
| Natural Gas | $192,590 | 59,596 |
MMBtu
|
$3.23 |
| Fuel Oil #2 | $345,723 | 181,149 |
MMBtu
|
$1.91 |
| Coal | $889,564 | 533,288 |
MMBtu
|
$1.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $55,681 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,972 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $32,873 | $4,000 | - |
$9,457
-
MMBtu
|
$23,416
-
MMBtu
|
|
| 02 | 2.1213: Direct warmest air to combustion intake | $7,709 | $3,000 | - | - |
$7,709
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,778 | $1,200 |
$2,778
90,563
kWh
|
- | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $9,866 | $15,850 | - |
$1,783
-
MMBtu
|
$8,083
-
MMBtu
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,427 | $1,373 |
$2,427
79,132
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28 | $92 |
$28
879
kWh
|
- | - | |
| TOTAL RECOMMENDED | $55,681 | $25,515 |
$5,233
170,574
kWh
|
$11,240
-
MMBtu
|
$39,208
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $47,972 | $22,515 |
$5,233
170,574
kWh
|
$11,240
-
MMBtu
|
$31,499
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs