Assessment Year 1989
Principal Product CONCRETE CONDUIT & PIPE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area
n/a
Annual Production 50,000
ton
Production Hrs. Annual 2,840
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,697 878,957
kWh
Natural Gas $25,570 6,791
MMBtu
LPG $2,005 250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $2,801 $1,700 - $2,801
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $243 $700 - $243
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $1,074 $850 - $1,074
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $1,656 $2,500 - $1,756
-
MMBtu
$(-100.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,520 $250 $1,520
19,343
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $423 $1,060 $423
5,569
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $200 $200 - $200
-
MMBtu
-
08 2.7221: Lower temperature during the winter season and vice-versa $220 $500 - $220
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $166 $211 $166
2,052
kWh
- -
TOTAL RECOMMENDED $8,303 $7,971 $2,109
26,964
kWh
$6,294
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $3,762 $3,661 $1,686
21,395
kWh
$2,176
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs