Assessment Year | 1989 |
---|---|
Principal Product | REFINED CADMIUM INGOTS |
NAICS |
n/a
|
SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 1,080,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,182 | 3,427,022 |
kWh
|
$0.049 |
Natural Gas | $210,170 | 59,783 |
MMBtu
|
$3.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,299 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $33,200 | $6,700 | - |
$33,200
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,410 | $5,000 |
$1,410
38,101
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $351 | $3,460 | - |
$351
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,887 | $4,162 |
$2,887
59,203
kWh
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $4,494 | $2,200 | - |
$4,494
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $2,193 | $10,000 | - |
$2,193
-
MMBtu
|
|
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $800 | $700 | - |
$800
-
MMBtu
|
|
08 | 2.7261: Install timers and/or thermostats | $657 | $750 | - |
$657
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $307 | $359 |
$307
6,448
kWh
|
- | |
TOTAL RECOMMENDED | $46,299 | $33,331 |
$4,604
103,752
kWh
|
$41,695
-
MMBtu
|
||
TOTAL IMPLEMENTED | $43,755 | $19,871 |
$4,604
103,752
kWh
|
$39,151
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs