ITAC Assessment: CO0130
ITAC logo
ITAC Assessment: CO0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product TOOL BITS FOR MINING
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 670,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,322 1,728,019
kWh
Natural Gas $76,578 20,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $4,097 $12,000 - - $4,097
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $406 - $406
6,741
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,197 $200 $1,197
20,223
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,756 $500 $2,756
-
kWh
- $(-1,000.0)
05 2.2514: Cover open tanks $1,520 $300 $864
14,654
kWh
$656
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $744 $200 $744
12,603
kWh
- -
07 2.1213: Direct warmest air to combustion intake $185 $200 - $185
-
MMBtu
-
08 2.2511: Insulate bare equipment $1,046 $200 $703
11,723
kWh
$343
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,162 $992 $1,162
19,637
kWh
- -
TOTAL RECOMMENDED $12,113 $14,592 $7,832
85,581
kWh
$1,184
-
MMBtu
$3,097
TOTAL IMPLEMENTED $10,357 $14,092 $5,076
85,581
kWh
$1,184
-
MMBtu
$4,097
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs