Assessment Year | 1988 |
---|---|
Principal Product | TOOL BITS FOR MINING |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 670,000
pieces
|
Production Hrs. Annual | 4,290
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,322 | 1,728,019 |
kWh
|
$0.059 |
Natural Gas | $76,578 | 20,327 |
MMBtu
|
$3.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,113 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,357 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $4,097 | $12,000 | - | - | $4,097 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $406 | - |
$406
6,741
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,197 | $200 |
$1,197
20,223
kWh
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,756 | $500 |
$2,756
-
kWh
|
- | $(-1,000.0) | |
05 | 2.2514: Cover open tanks | $1,520 | $300 |
$864
14,654
kWh
|
$656
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $744 | $200 |
$744
12,603
kWh
|
- | - | |
07 | 2.1213: Direct warmest air to combustion intake | $185 | $200 | - |
$185
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $1,046 | $200 |
$703
11,723
kWh
|
$343
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,162 | $992 |
$1,162
19,637
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,113 | $14,592 |
$7,832
85,581
kWh
|
$1,184
-
MMBtu
|
$3,097 | ||
TOTAL IMPLEMENTED | $10,357 | $14,092 |
$5,076
85,581
kWh
|
$1,184
-
MMBtu
|
$4,097 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs