ITAC Assessment: CO0117
ITAC logo
ITAC Assessment: CO0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GRAN. SUGAR, CATTLE FEED
NAICS
n/a
SIC 2063: Beet Sugar
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 109,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,028 11,869,871
kWh
Natural Gas $231,587 63,038
MMBtu
Coal $1,337,762 990,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.2136: Install / repair insulation on steam lines $4,830 $10,130 - $4,830
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,702 $139,000 $18,780
484,467
kWh
$1,922
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,167 - $3,780
97,597
kWh
$387
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $858 $1,000 $778
20,223
kWh
$80
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,747 $6,500 $1,585
41,032
kWh
$162
-
MMBtu
06 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $56,432 $60,000 - $56,432
-
MMBtu
TOTAL RECOMMENDED $88,736 $216,630 $24,923
643,319
kWh
$63,813
-
MMBtu
TOTAL IMPLEMENTED $32,304 $156,630 $24,923
643,319
kWh
$7,381
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs