ITAC Assessment: CO0116
ITAC logo
ITAC Assessment: CO0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GRAN. SUGAR, CATTLE FEED
NAICS
n/a
SIC 2063: Beet Sugar
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,600
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,780 7,305,100
kWh
Natural Gas $39,110 8,657
MMBtu
Coal $1,274,834 1,098,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $271,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $267,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $151,329 $7,000 - - $151,329
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $753 $18,000 - - $753
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,758 - $2,540
68,581
kWh
- $218
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,814 $7,000 $5,354
144,490
kWh
- $460
-
MMBtu
05 2.7261: Install timers and/or thermostats $3,390 $375 - $3,390
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $107,194 $100,000 - - $107,194
-
MMBtu
TOTAL RECOMMENDED $271,238 $132,375 $7,894
213,071
kWh
$3,390
-
MMBtu
$259,954
-
MMBtu
TOTAL IMPLEMENTED $267,848 $132,000 $7,894
213,071
kWh
- $259,954
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs