ITAC Assessment: CO0095
ITAC logo
ITAC Assessment: CO0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product BONELESS BEEF PRODUCTS
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area
n/a
Annual Production 85,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,184 5,569,754
kWh
Natural Gas $355,344 77,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $84,858 $27,000 - $84,858
-
MMBtu
02 2.2121: Increase amount of condensate returned $19,460 $1,000 - $19,460
-
MMBtu
03 2.2491: Use cooling air which cools hot work pieces for space heating $3,467 $500 - $3,467
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $573 $500 - $573
-
MMBtu
05 2.2511: Insulate bare equipment $2,502 $950 - $2,502
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $4,535 $250 - $4,535
-
MMBtu
07 2.2111: Install steam trap $483 $220 - $483
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $253 $300 $253
6,155
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $581 - $581
14,068
kWh
-
TOTAL RECOMMENDED $116,712 $30,720 $834
20,223
kWh
$115,878
-
MMBtu
TOTAL IMPLEMENTED $110,162 $29,270 $253
6,155
kWh
$109,909
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs