ITAC Assessment: CO0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product IMPRINTED CHECKS & FORMS
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 23,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,822 4,336,167
kWh
Natural Gas $55,743 13,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $743 $800 $743
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $822 $75 $822
16,999
kWh
-
03 2.7261: Install timers and/or thermostats $2,651 $175 $106
2,052
kWh
$2,545
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $817 $400 $817
16,706
kWh
-
05 2.4312: Improve lubrication practices $608 - $608
12,603
kWh
-
06 2.4133: Use most efficient type of electric motors $399 $676 $399
8,206
kWh
-
07 2.2437: Recover waste heat from equipment $1,261 $1,500 - $1,261
-
MMBtu
08 2.7261: Install timers and/or thermostats $22,175 $1,682 $7,772
161,196
kWh
$14,403
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,091 $2,000 $4,091
83,822
kWh
-
TOTAL RECOMMENDED $33,567 $7,308 $15,358
301,584
kWh
$18,209
-
MMBtu
TOTAL IMPLEMENTED $33,567 $7,308 $15,358
301,584
kWh
$18,209
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs