ITAC Assessment: CO0090
ITAC logo
ITAC Assessment: CO0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CAPACITORS,SHEET METAL BOXES
NAICS
n/a
SIC 3675: Electronic Capacitors
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,235 1,110,492
kWh
Natural Gas $21,018 4,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $381 $200 $381
7,034
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $73 $100 $73
1,465
kWh
-
03 2.2437: Recover waste heat from equipment $528 $350 - $528
-
MMBtu
04 2.3191: Use demand controller or load shedder $689 $1,200 $689
-
kWh
-
05 2.7229: Air condition only space necessary $556 $100 $556
9,965
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $375 $500 $(-42.0)
(-879)
kWh
$417
-
MMBtu
07 2.7221: Lower temperature during the winter season and vice-versa $4,133 $2,000 - $4,133
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,147 $1,350 - $1,147
-
MMBtu
09 2.7492: Use proper thickness of insulation on building envelope $65 $90 - $65
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $999 $1,000 $999
18,171
kWh
-
TOTAL RECOMMENDED $8,946 $6,890 $2,656
35,756
kWh
$6,290
-
MMBtu
TOTAL IMPLEMENTED $8,873 $6,790 $2,583
34,291
kWh
$6,290
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs