| Assessment Year | 1987 |
|---|---|
| Principal Product | AGRICULTURAL EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 400 |
| Plant Area |
n/a
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $227,020 | 7,592,907 |
kWh
|
$0.030 |
| Natural Gas | $376,574 | 84,204 |
MMBtu
|
$4.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $126,125 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $51,471 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,416 | $21 |
$42
1,465
kWh
|
$2,374
-
MMBtu
|
|
| 02 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $2,026 | $150 | - |
$2,026
-
MMBtu
|
|
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,537 | $500 | - |
$6,537
-
MMBtu
|
|
| 04 | 2.2531: Re-size charging openings or add movable cover or door | $8,540 | $3,000 | - |
$8,540
-
MMBtu
|
|
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $726 | $300 | - |
$726
-
MMBtu
|
|
| 06 | 2.7261: Install timers and/or thermostats | $13,198 | - | - |
$13,198
-
MMBtu
|
|
| 07 | 2.7231: Use radiant heater for spot heating | $50,245 | $180,000 | - |
$50,245
-
MMBtu
|
|
| 08 | 2.7243: Improve air circulation with destratification fans / other methods | $19,113 | $24,000 |
$(-916.0)
(-30,774)
kWh
|
$20,029
-
MMBtu
|
|
| 09 | 2.7229: Air condition only space necessary | $8,911 | $2,100 | - |
$8,911
-
MMBtu
|
|
| 10 | 2.7492: Use proper thickness of insulation on building envelope | $3,042 | $7,140 | - |
$3,042
-
MMBtu
|
|
| 11 | 2.7492: Use proper thickness of insulation on building envelope | $3,916 | $13,440 | - |
$3,916
-
MMBtu
|
|
| 12 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,066 | $750 |
$3,066
165,006
kWh
|
- | |
| 13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,437 | $1,000 |
$2,437
81,477
kWh
|
- | |
| 14 | 2.2437: Recover waste heat from equipment | $1,473 | $750 | - |
$1,473
-
MMBtu
|
|
| 15 | 2.4221: Install compressor air intakes in coolest locations | $479 | $300 |
$479
16,120
kWh
|
- | |
| TOTAL RECOMMENDED | $126,125 | $233,451 |
$5,108
233,294
kWh
|
$121,017
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $51,471 | $27,771 |
$5,108
233,294
kWh
|
$46,363
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs