| Assessment Year | 1987 |
|---|---|
| Principal Product | PRESTRESSED CONCRETE |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 810
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,843 | 1,346,131 |
kWh
|
$0.065 |
| Natural Gas | $103,892 | 26,167 |
MMBtu
|
$3.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,558 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,341 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $9,969 | $200 | - |
$9,969
-
MMBtu
|
|
| 02 | 2.2135: Repair and eliminate steam leaks | $2,954 | $600 | - |
$2,954
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $7,174 | $1,000 | - |
$7,174
-
MMBtu
|
|
| 04 | 2.3191: Use demand controller or load shedder | $2,574 | $2,000 |
$2,574
-
kWh
|
- | |
| 05 | 2.4312: Improve lubrication practices | $265 | - |
$265
4,103
kWh
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $2,042 | - |
$2,042
31,653
kWh
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $421 | $500 | - |
$421
-
MMBtu
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,040 | $200 |
$1,040
16,120
kWh
|
- | |
| 09 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $1,378 | $2,829 | - |
$1,378
-
MMBtu
|
|
| 10 | 2.2136: Install / repair insulation on steam lines | $155 | $347 | - |
$155
-
MMBtu
|
|
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $586 | $366 |
$586
9,086
kWh
|
- | |
| TOTAL RECOMMENDED | $28,558 | $8,042 |
$6,507
60,962
kWh
|
$22,051
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,341 | $3,213 |
$3,668
56,859
kWh
|
$20,673
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs