ITAC Assessment: CO0087
ITAC logo
ITAC Assessment: CO0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRESTRESSED CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 810
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,843 1,346,131
kWh
Natural Gas $103,892 26,167
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,341

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $9,969 $200 - $9,969
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $2,954 $600 - $2,954
-
MMBtu
03 2.7261: Install timers and/or thermostats $7,174 $1,000 - $7,174
-
MMBtu
04 2.3191: Use demand controller or load shedder $2,574 $2,000 $2,574
-
kWh
-
05 2.4312: Improve lubrication practices $265 - $265
4,103
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $2,042 - $2,042
31,653
kWh
-
07 2.2437: Recover waste heat from equipment $421 $500 - $421
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,040 $200 $1,040
16,120
kWh
-
09 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $1,378 $2,829 - $1,378
-
MMBtu
10 2.2136: Install / repair insulation on steam lines $155 $347 - $155
-
MMBtu
11 2.7142: Utilize higher efficiency lamps and/or ballasts $586 $366 $586
9,086
kWh
-
TOTAL RECOMMENDED $28,558 $8,042 $6,507
60,962
kWh
$22,051
-
MMBtu
TOTAL IMPLEMENTED $24,341 $3,213 $3,668
56,859
kWh
$20,673
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs