Assessment Year | 2013 |
---|---|
Principal Product | Metal Stampings and Welded Parts |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
150,000
ft2
|
Annual Production | 78,000,000
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $412,146 | 5,053,700 |
kWh
|
$0.082 |
Electricity Demand | $181,037 | 10,749 |
kW-mo/yr
|
$16.84 |
Natural Gas | $81,519 | 10,420 |
MMBtu
|
$7.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,042 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $9,900 | $13,000 |
$7,600
92,500
kWh
|
$2,300
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,480 | $3,300 |
$7,631
93,060
kWh
|
$2,849
-
kW-mo/yr
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $1,115 | - |
$812
9,900
kWh
|
$303
-
kW-mo/yr
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $6,752 | $5,000 |
$6,752
82,346
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $695 | $308 |
$537
6,552
kWh
|
$158
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $28,942 | $21,608 |
$23,332
284,358
kWh
|
$5,610
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $19,042 | $8,608 |
$15,732
191,858
kWh
|
$3,310
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs